QUEENSLAND

Canopy’s Edge Boulevard, Smithfield, Cairns QLD

  • ADDRESS :
  • SDA DESIGN CATEGORY : HPS & Robust
  • SDA TYPE : House & Villa
  • NUMBER OF ROOMS : 3 x 1 bedroom robust villas with OOA, 1 x 2 bedroom robust home with OOA and 1 x 3 bedroom HPS home
  • AVAILABILITY :
  • COMPLETION DATE : FEB 2024
An innovative, holistic new approach to delivering accommodation for people living with a disability

One of our flagship developments

One of our flagship developments, this is an innovative, holistic new approach to delivering accommodation for people living with a disability and introduces a new concept in accessible housing focused on both robust residents and HPS tenants

o Premium location with private street access and fully accessible footpaths along the local creek and the Smithfield shopping centre (500m away).

o The 2000m2 site is split into three blocks of land bordered by a nature reserve with a lovely outlook towards the Kuranda Scenic Sky rail.

o There are two architecturally designed homes and four private villas which have been designed to exceed the Specialist Disability Accommodation (SDA) standards.

o Supportive community facilities include an outdoor BBQ area, extensive landscaping, outdoor sensory shower & a fully accessible magnesium salt hydrotherapy pool.

o North facing open plan living spaces take advantage of Cairns’ tropical climate.

o WIFI Aircon systems to controlling individual temperature needs in each room.

o Each large bedroom features a custom ensuite bathroom and private terraces to maximise privacy & separation. Each home is also pet friendly.

o To maximise the safety of our residents, all homes incorporate Onsite Overnight Accommodation (OOA), emergency planning and fire sprinkler systems.

o Energy assessment & sustainability reviews completed by external consultants with features such a home Insulation & Solar panels added to reduce annual utility costs.

SDA DESIGN CATEGORY

HPS & Robust

SDA TYPE

House & Villa

NUMBER OF ROOMS

3 x 1 bedroom robust villas with OOA, 1 x 2 bedroom robust home with OOA and 1 x 3 bedroom HPS home

COMPLETION DATE

FEB 2024